2018/08—Proposed 2019 Fees for Electricity in the Jervis Bay Territory

6 September 2018

2018/08—Proposed 2019 Fees for Electricity in the Jervis Bay Territory
PDF: 371 KB

The Jervis Bay Territory Administration (Administration) facilitates the provision of electricity supply in the Jervis Bay Territory (JBT). It is proposed to update the electricity fees in the JBT, effective from 1 January 2019 through the Electricity Supply Fees Determination 2019 (Jervis Bay Territory).

A number of factors were considered in developing the proposed 2019 electricity fees, including retail pricing of electricity in the nearby Shoalhaven region and the costs of providing electricity within the JBT.

The proposed fees are set out in a draft Determination which is available:

Tables comparing the current electricity supply fees to the proposed fees can be found starting overleaf.

If you would like to comment on the draft Determination, please send your written submission to the Administration at the address in the footer of this page or by email to jbt@infrastructure.gov.au

Submissions will be accepted up until 5.00pm on 21 September 2018.

Chris Baseler
Operations Manager
Jervis Bay Territory Administration

Jervis Bay Territory Electricity Fees (GST inclusive) comparison table:

Domestic supply

Item

Description

Cost Units

2018 Fee

(GST incl)

2019 Fee

(GST incl)

Variance

1

System access

$/day

0.91179

0.9317

2.18%

2

First 1000 kWh for a 90–day period

$/kWh

0.23839

0.22882

-4.01%

3

Next 750 kWh for a 90–day period

$/kWh

0.23839

0.22882

-4.01%

4

For the balance of all electricity supply

$/kWh

0.23839

0.22882

-4.01%

Domestic Supply controlled off–peak

Item

Description

Cost Units

2018 Fee

(GST incl)

2019 Fee

(GST incl)

Variance

1

Off-peak access for off-peak 1

$/day

0.06853

0.0473

-30.98%

2

Off–peak 1 (up to 9 hours off–peak supply daily)

$/kWh

0.09196

0.09202

0.07%

3

Off-peak access for off-peak 2

$/day

0.06853

0.0484

-29.37%

4

Off–peak 2 (up to 18 hours off–peak supply daily)

$/kWh

0.14802

0.12658

-14.48%

Note: All fees listed are GST inclusive, refer Section 99–1, A New Tax System (Goods and Services Tax) Act 1999 and GST Ruling 2006/2.

General supply

Item

Description

Cost Units

2018 Fee (GST incl)

2019 Fee (GST incl)

Variance

1

System access

$/day

0.93346

1.1165

19.61%

2

2500 kWh for 90–day period

$/kWh

0.23210

0.23818

2.62%

3

For the balance of all electricity supply

$/kWh

0.2420

0.23917

-1.17%

General supply controlled off–peak

Item

Description

Cost Units

2018 Fee

(GST incl)

2019 Fee

(GST incl)

Variance

1

Off-peak access for off-peak 1

$/day

0.06853

0.0473

-30.98%

2

Off–peak 1 (up to 9 hours off–peak supply daily)

$/kWh

0.09196

0.09202

0.07%

3

Off-peak access for off-peak 2

$/day

0.06853

0.0484

-29.37%

4

Off–peak 2 (up to 18 hours off–peak supply daily)

$/kWh

0.14802

0.12658

-14.48%

Note: All fees listed are GST inclusive, refer Section 99–1, A New Tax System (Goods and Services Tax) Act 1999 and GST Ruling 2006/2.

LV industrial supply

Item

Description

Cost Units

2018 Fee

 (GST incl)

2019 Fee

(GST incl)

Variance

1

For all electricity supply

$/kWh

0.1205

0.1247

3.49%

11kV time–of–use demand supply

Item

Description

2018 Fee(GST incl)

2019 Fee(GST incl)

Variance

1

Monthly fee

$/kVA

9.0120

9.1978

2.06%

2

For electricity supply during a peak period

$/kWh

0.11730

0.11093

-5.43%

3

For electricity supply during a shoulder period

$/kWh

0.11105

0.11016

-0.80%

4

For electricity supply during an off–peak period

$/kWh

0.07050

0.08376

18.81%

Domestic Customer Rebates

Item

Description

Cost Units

2018 Fee

 (GST incl)

2019 Fee

(GST incl)

Variance

1

Pensioner rebate

$/day

0.73

0.86

17.81%

2

Life support or constant positive airway pressure respirators rebate

$/day

0.65

0.78

20.00%

Note: All fees listed are GST inclusive, refer Section 99–1, A New Tax System (Goods and Services Tax) Act 1999 and GST Ruling 2006/2.

Connection of electricity supply — fees payable before connection

Item

Description

2018 Fee ($ GST incl)

2019 Fee ($ GST incl)

Variance

1

New account supply connection fee

29.98

0.00

-100%

Other Fees

Item

Description

2018 Fee ($ GST inc)

2019 Fee ($ GST incl)

Variance

1

Disconnection fee at the meter board

148.50

132.00

-11.1%

2

Reconnection fee at the meter board

148.50

132.00

-11.1%

3

Combined disconnection/reconnection fee—at the pole or distribution pillar

583.00

583.00

0%

4

Meter test requested by customer

457.13

240.00

-47.50%

5

Extraordinary meter reading due to no access

148.50

132.00

-11.1%

6

Notice of disconnection delivery fee

19.80

19.80

0%

7

Each customer requested change of off–peak pricing option in excess of once in a 12–month period

148.50

132.00

-11.1%

Note: All fees listed are GST inclusive, refer Section 99–1, A New Tax System (Goods and Services Tax) Act 1999 and GST Ruling 2006/2.

The Department is collecting personal information for the purposes of seeking comment on the proposed Electricity Supply Fees Determination 2019 (Jervis Bay Territory).

The Department will only use this information for consideration to redraft the Electricity Supply Fees Determination 2019 (Jervis Bay Territory) if required and will not disclose information to third parties.